ticas
Structural
- Feb 4, 2013
- 102
Do you have sites where all of this are shown in details? Two long span slab 5 meters length are to have continuous bars running at bottom and top. I pressume the splicing of those bars is similar to splicing in beam where the top continuous bar are spliced at center, but can you splice the lower bars right at beam support instead of near it the beams?