bluedieselblack
Mechanical
We have an original design with an 8" XX Heavy 304 SS pipe through a A-105 CS, 1500# blind, 7.25" thick. Operating at 600 F. The weld is not full penetration each ends has 1.5" groove and 7/8" fillet. What would be a good way to evaluate the stress in the pipe between the welds due to the differnece in thermal expansion?
Thanks
Thanks