ChiangJaron
Industrial
- Mar 27, 2015
- 40
Dear All,
I have some question about stainless material testing, special the material subject to PWHT.
Pressure vessel with SS321 material including pipe and flange.
All impact test requirement exempt from all rule of code, except UHA-51(c).
The pressure vessel to be perform PWHT.
Question 1: As per UHA-51(c), the impact testing shall perform following UHA-51(a) , that including base metal, welds, and HAZ impact test only?
Question 2: The impact testing required by UHA-51(c) depended on PWHT (not note 82 mentions base and weld metal), it can be exempt from WPS/PQR with impact test?
Question 3: UHA-51(c) impact test timing can be used production testing to instead of?
Question 4: UHA-51(c) impact testing can be used exist WPS/PQR with impact test to instead of?
I have some question about stainless material testing, special the material subject to PWHT.
Pressure vessel with SS321 material including pipe and flange.
All impact test requirement exempt from all rule of code, except UHA-51(c).
The pressure vessel to be perform PWHT.
Question 1: As per UHA-51(c), the impact testing shall perform following UHA-51(a) , that including base metal, welds, and HAZ impact test only?
Question 2: The impact testing required by UHA-51(c) depended on PWHT (not note 82 mentions base and weld metal), it can be exempt from WPS/PQR with impact test?
Question 3: UHA-51(c) impact test timing can be used production testing to instead of?
Question 4: UHA-51(c) impact testing can be used exist WPS/PQR with impact test to instead of?