Inspector21
Mechanical
- Dec 18, 2012
- 2
I am attempting to perform a standpipe flow test on a residential high-rise that was built in 1963. It is located in Houston. Does anyone know what the required gpm and residual flow that is needed at the most remote hose connection? The local AHJ is saying that 25 psi residual is sufficient. But the required gpm is not known. The building currently has a 500 gpm fire pump. And the building was recently retro fitted with sprinklers in all common areas. A 4" standpipe was installed for the floor controls and was tied into the original standpipe in multiple locations.