The slab-on-grade is post-tensioned. It will be poured together with the column spread footing. Architect preferred the steel column has a regular block-out so the base plates, grout, and anchor bolts can be hided. But to do that, the tendon of the slab will need to cut/stop at the block-out area. That means the slab at column strips is not post-tensioned. Is it OK? Thanks a lot for your help.