brnt
Civil/Environmental
- May 7, 2010
- 22
A contractor bored and installed a 150 foot steel smooth walled culvert under a secondary higheway. The grade on the culvert is flowing the wrong way.The contractor is proposing the fix the problem by digging and exposing the high end of the culvert to the road and with a welding/cutting torch removing small bands of steel. I don't know exactly how this works--I think by removing some of the steel from underneath the pipe the pipe will weaken and drop down. Anyone ever heard of this?