GeoSoil
Geotechnical
- May 5, 2012
- 5
Is there an AASHTO spec for the steel soldier pile sacrificial thickness when the design life is 100 years vs, 75 years? This pertains to a cantilvered sldier pile and lagging retaining wall.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.