Mohamed Maher
Structural
- Dec 31, 2017
- 132
Hi all
I have two beams with box section members , we want make splice for it and the suggested splice from architect to insert box in between
With length 400 mm from each side and we will add only some bolts for fixation between the main outside beam boxes and the inserted box .
The gap between the inserted box and the outer beam 8s 1 mm from each side.
My question is the inserted box should be designed based on the same moment on the external beams
Thanks