GleasonS
Civil/Environmental
- Feb 27, 2009
- 5
When calculating time of concentration, how do you account for a detention pond?
My site drains to a small creek and the proposed development includes a small pond through which most of the site will drain. I'm thinking the most appropriate point at which to calculate the time of concentration would be where the creek leaves my site, but this then means that I'll have a pond intercepting a fair portion of my runoff. Would you add the time for the runoff to route through the pond to the overland flow?
My site drains to a small creek and the proposed development includes a small pond through which most of the site will drain. I'm thinking the most appropriate point at which to calculate the time of concentration would be where the creek leaves my site, but this then means that I'll have a pond intercepting a fair portion of my runoff. Would you add the time for the runoff to route through the pond to the overland flow?