BillsSis
Civil/Environmental
- Apr 3, 2015
- 25
hello all,
I am reviewing a proposed construction site's drainage report. Included in it is a detention basin to capture the water after construction, slow it down and then take it to the ditch of the adjoining state highway. The parking lot area of the proposed construction site has a storm sewer system collectively taking the storm water into the detention basin. Would I analyze the storm sewer system according to HEC 22, thereby whatever end value runoff I get from the system analysis, I would put into the detention basin? Also, there is a small area of grass which will drain into the same detention basin.
My other question...will each area - the detained one using the storm sewer system and the undetained one (the small area of grass) - have their own hydrograph (peak flow and volume) going into the detention basin?
Thanks for any insight!
I am reviewing a proposed construction site's drainage report. Included in it is a detention basin to capture the water after construction, slow it down and then take it to the ditch of the adjoining state highway. The parking lot area of the proposed construction site has a storm sewer system collectively taking the storm water into the detention basin. Would I analyze the storm sewer system according to HEC 22, thereby whatever end value runoff I get from the system analysis, I would put into the detention basin? Also, there is a small area of grass which will drain into the same detention basin.
My other question...will each area - the detained one using the storm sewer system and the undetained one (the small area of grass) - have their own hydrograph (peak flow and volume) going into the detention basin?
Thanks for any insight!