MEEZ
Civil/Environmental
- Jun 9, 2010
- 2
I am modeling this long/deep stormdrain system and I have majority of the system flowing full. Although I am meeting the HGL requirements, I wonder if I need to upsize the pipes, since its based open channel/backwater analysis?