IsaacStructural
Structural
- Dec 1, 2010
- 172
I've got a project with a civil component and I'm looking for a general guideline concerning the price. The project is a city parking lot, 100'x125'. The scope of work is a boundary and topo survey and stormwater design, with a couple curb cuts.
Although I don't do civil work anymore, this doesn't seem like an especially large or demanding project. The civil engineer we typically work with gave us an estimate that the project would take 80hrs, not including the survey/topo, which would be performed by others. Is this a reasonable time estimate?
Our client indicated they had received other proposals that were substantially cheaper, though I didn't ask for the exact number.
Anyone care to share a general range for this work? I understand local factors come into play, but I'm looking for some guidance.
Thanks.
Licensed Structural Engineer and Licensed Professional Engineer (Illinois)
Although I don't do civil work anymore, this doesn't seem like an especially large or demanding project. The civil engineer we typically work with gave us an estimate that the project would take 80hrs, not including the survey/topo, which would be performed by others. Is this a reasonable time estimate?
Our client indicated they had received other proposals that were substantially cheaper, though I didn't ask for the exact number.
Anyone care to share a general range for this work? I understand local factors come into play, but I'm looking for some guidance.
Thanks.
Licensed Structural Engineer and Licensed Professional Engineer (Illinois)