vincentpa
Structural
- Nov 9, 2005
- 223
A long time ago when I was designing larger buildings, I had to design a lot of combined footings. One time however, I had to design a strap footing. I can't remember why I had to use a strap instead of a combined footing. Can anyone explain when it is appropriate to use a strap footing over a combined footing? I also forgot the simple design of the strap footing. Can anyone refresh my memory?