Hi...we have a case where we need to fix one perforated plate of 8 mm thickness below the tubesheet exactly alligned with the tube holes (Tubes no = 1000). Tubes dia is 19.05 mm and hole dia on perforated plate is 7 mm. Perforated plate will be fixed with the tubesheet by providing 10 nos of bolts. Drilling depth of bolts are around 38 mm inside the tubesheet (Bolt hole dia is around 12 mm). Holes will be drilled within the OTL. As per ASME calculation of existing tubesheet, thickness comes out to be 72 mm and provided thickness is 73 mm. So we don't have any margin available.
Will drilling of 38 mm length holes of some 10 no of locations have any effect on tubesheet thickness and strength?? What is the procedure of calculating the remaining tubesheet thickness without going for FEA analysis?? Our intension is to fix the perforated plates in the existing tubesheet only.
Will drilling of 38 mm length holes of some 10 no of locations have any effect on tubesheet thickness and strength?? What is the procedure of calculating the remaining tubesheet thickness without going for FEA analysis?? Our intension is to fix the perforated plates in the existing tubesheet only.