zishan99
Mechanical
- Mar 11, 2006
- 15
A piping is designed to connect from compressor discharge and buffer storage tank.In case of compressor shutdown this piping will supplly nitrogen gas(as an alternate arrangement)to the plant,from the discharge piping of the compressor.The tie-in point at the discharge piping has a noticeable vibration duringf compressor is in operation.
The problem is that we have to install the piping as well as we have to do the stress analysis of this piping.What to do with this vibration and how to do the stress analysis?
Regards.