QuickFlange
Petroleum
- Mar 5, 2009
- 14
i am involved in a job in installing new MSV skid (2 already existing) where 16" bulk header is extended for a length of 15m. Will the pipe needs to be stress analysed? Design temp. 82 deg C. Rating 600#
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.