teb1
Mechanical
- Nov 21, 2002
- 52
I am welding a 3" thick x 70" OD tube x 48" long. This piece will be machined afer welding on the OD and ID. This is not a code pressure vessel part. Since I want to machine it after it is welded and I don't want it "walking around" during the machining I am debating whether to specify a normalization vs a stress relief post weld heat treatment of the tube.
I would appreciate any thoughts and recommendations.
Thanks.
I would appreciate any thoughts and recommendations.
Thanks.