Downhand
Industrial
- Dec 20, 2009
- 59
I have an engineer who wants the welder to grind out part of the cap and part of the fill pass (from 3 o'clock to 7 o'clock) and the refill that area in an attempt to cause the pipe to move because it is too far out of alignment with a pump. What would cause more pipe movement; refilling with one weave with a bigger electrode or refilling with stringers with a smaller electrode but more passes.