Hello fellow engineers:
I've started working on my own doing structural design. I've worked for 10+ years in this field with private firms; I started on my own maybe for a year or two (moonlighting mostly)
I have a client, with a potential job and I want to make sure I'm heading in the right direction when it comes to pricing my services.
This client wants to build carports for a mobile park, in order to provide shade for RVs. The carports will be very simple, about 50'x15'
My question is, since this carport will be used repetitively, do we charge a fee for each one of them?
I'm used to single type projects (homes, apartments, commercial buildings), but never had the opportunity for something like this.
My first reaction is that we're liable for every single carport regardless if its the same design. But again, it's a repetitive design so we won't be working consistently in all of them.
I talked with my insurance and they told me that I'd be cover for this type of project; I'm just trying to figure out what the percentage in value/service should be.
Thanks
I've started working on my own doing structural design. I've worked for 10+ years in this field with private firms; I started on my own maybe for a year or two (moonlighting mostly)
I have a client, with a potential job and I want to make sure I'm heading in the right direction when it comes to pricing my services.
This client wants to build carports for a mobile park, in order to provide shade for RVs. The carports will be very simple, about 50'x15'
My question is, since this carport will be used repetitively, do we charge a fee for each one of them?
I'm used to single type projects (homes, apartments, commercial buildings), but never had the opportunity for something like this.
My first reaction is that we're liable for every single carport regardless if its the same design. But again, it's a repetitive design so we won't be working consistently in all of them.
I talked with my insurance and they told me that I'd be cover for this type of project; I'm just trying to figure out what the percentage in value/service should be.
Thanks