TJB
Mechanical
- Nov 11, 1999
- 1
I HAVE 3 CONCRETE 'PILLARS' 760mm SQUARE ABOUT 2-2.5M HIGH.<br>
<br>
4 MECHANICAL STRUCTURES OF APPOX. 1 TONNE AND WITH LARGE MOVING PARTS (100RPM) IS TO BE PLACED ON THESE STRUCTURES WITH M20 CHEMICAL BOLTS (6) ALL AT LEAST 175mm FROM EDGE.<br>
<br>
I AM THINKING WE SHOULD INCREASE THE SIZE OF PILLAR TO AROUND 1000mm SQ. WITH NEW CONCRETE, BUT OLD STRUCTURE IS AROUND 50 YEARS OLD.<br>
<br>
I KNOW OLD AND NEW CONCRETE WILL NOT 'FIX' TO EACH OTHER BUT SHOULD A 250mm 'CASING' SUPPLY ENOUGH SUPPORT?<br>
<br>
ARE THERE LIKELY TO BE OTHER PROBLEMS ENCOUNTERED?
<br>
4 MECHANICAL STRUCTURES OF APPOX. 1 TONNE AND WITH LARGE MOVING PARTS (100RPM) IS TO BE PLACED ON THESE STRUCTURES WITH M20 CHEMICAL BOLTS (6) ALL AT LEAST 175mm FROM EDGE.<br>
<br>
I AM THINKING WE SHOULD INCREASE THE SIZE OF PILLAR TO AROUND 1000mm SQ. WITH NEW CONCRETE, BUT OLD STRUCTURE IS AROUND 50 YEARS OLD.<br>
<br>
I KNOW OLD AND NEW CONCRETE WILL NOT 'FIX' TO EACH OTHER BUT SHOULD A 250mm 'CASING' SUPPLY ENOUGH SUPPORT?<br>
<br>
ARE THERE LIKELY TO BE OTHER PROBLEMS ENCOUNTERED?