Hosking
Mechanical
- Jan 10, 2013
- 5
have a monorail design
however need a significant sized stub shaft of about 3 m long.
allowing for off vertical loading may put extra bending moment on the connections of this shaft.
any other alarms that i should be considering outside of this fact?
happy holidayz.
however need a significant sized stub shaft of about 3 m long.
allowing for off vertical loading may put extra bending moment on the connections of this shaft.
any other alarms that i should be considering outside of this fact?
happy holidayz.