Hi Guys,
How to calculate the methane leakage of subsea pipeline between SSIV and Riser SDV with empty inventory due to blowdown of the inventory but with the passing rate of 124 kg/ hr at SSIV (SSIV supposed to fully isolated the inventory from any passing)?
Appreciate your thoughts on this.
Thank you.
How to calculate the methane leakage of subsea pipeline between SSIV and Riser SDV with empty inventory due to blowdown of the inventory but with the passing rate of 124 kg/ hr at SSIV (SSIV supposed to fully isolated the inventory from any passing)?
Appreciate your thoughts on this.
Thank you.