dicksewerrat
Civil/Environmental
- May 16, 2002
- 1,946
I am working on a problem with 'vortexes' forming in a MH . there are 2 18 inch HDPE suction lines to 2 different pumps. They are moving 5300 gpm down 2 18 inch bypass lines. The suction lift is 18 feet. Submergence is 5 feet. I have a graph to pull minimum submergence from and a calculator for the same. the graph is based on velocity and calculator is based on inside Dia. and Q. Would separating the suction lines help? Or do we need to increase submergence ? And do you guys have any other suggestions. Thanks
Richard A. Cornelius, P.E.
Richard A. Cornelius, P.E.