MKA4281
Petroleum
- Feb 9, 2012
- 5
I am facing a big problem in our Alloy 20 piping in the sulfuric acid system ( 98%).
This is a new system commissioned few months ago , I am experiencing many leaks due to erosion . The max velocity as per design is 0.2 mt/sec. so what do you think is the problem
This is a new system commissioned few months ago , I am experiencing many leaks due to erosion . The max velocity as per design is 0.2 mt/sec. so what do you think is the problem