Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Sulphur Tail gas blower

Status
Not open for further replies.

legro

Chemical
Oct 26, 2005
1
Hi members,
I am working on one debottleneck existing SCOT unit revamp project.
For the low-pressure supply from upstream, we need one new tail gas blower to push the gas through the downstream system.
The problem is, there are 505 kg/hr (8500 wtppm) H2S and 480 kg/hr (8000 wt ppm) SO2, with 3400kg/hr H2O in the gas stream at 132ºC w/ 135 kPa-a condition, I consider how to deal with the corrosion problem for the new blower and what kind material should used for the case / impeller and all the associated parts.
I do not have any experience about this kind design.
Is there some standard can help?

Thanks,



 
Status
Not open for further replies.

Part and Inventory Search

Sponsor