Hello,
I consider to install twin seal valves at a marine pier manifold (8") to avoid product contamination issue for multipurpose petroleum products unloading line.
As the pier is not connected to a slop tank we need to contain the bleed drains drips in routine and in case of leakage into a closed sump.
Do anybody has an idea of the volume/leakage flowrate/routine bleeding flowrate we should consider for 10 8" valves ?
Does anyone experience leakage aside valves open/close phases ?