Mechanical
May 8, 2014
51
The customer is saying to RT per code and give a reference to >750 degree F temperature and >2" NPS which is taken from B31.1.

The pipe material is 6 5/8" O.D X 1" M.W. I am saying that these supply lines are still under ASME Sec. 1 and do not need RT'd per code.

I checked PG 58.3.2 & 58.3.3 but I am unfamiliar as to actual start up of boilers regarding the steam seperation systems. I do not think these supply lines are part of that though.



Please see attached :
 
 http://files.engineering.com/getfile.aspx?folder=1f2b1633-44e3-47b3-9565-1a17eb42cecf&file=001.jpg
Replies continue below

Recommended for you

What you show are within the boundary of ASME Section I. Please review Table PW-11 for NDT requirements.
 
The piping would fall under boiler external piping (BEP) which is B31.1 technical, but it still is Section I administratively.
 
Ok. So we would NDE the supply tubes according to ASME 1. pw-11 & NDE the piping per table 136.4 in B31.1

Thank you much
 
Just for clarification , where do these supply tubes fall into boiler proper on this particular unit's steam flow pertaining to Figures 58.3.2 &/or 58.3.3 of ASME Sec.1 ?

I re-highlited and attached the drawing to show where I was referring to in the original question.
 
 http://files.engineering.com/getfile.aspx?folder=ca858193-3666-41f8-a657-7f53836f330b&file=001.jpg
Thanks. What you have now highlighted in red is all link piping under boiler proper of Section I, PG 58.3.3.

- Boiler Proper – The ASME Boiler and Pressure Vessel Code (ASME BPVC) has total
administrative jurisdiction and technical responsibility (refer to Section I Preamble).
 