nazua91
Mechanical
- Aug 17, 2016
- 4
We are now facing a problem where when a vessel have to apply with seismic and wind speed to it, the PV Elite have a limitation to provide an analysis. The common issues are when the bolt hole is only 1 per each base plate or some of the material use such as channel is use for the support leg.
The PV Elite usually recommended us to use 16mm thick plate with 25mm bolt size where some time not economical and rejected by client
What should I do about this?
Thanks
The PV Elite usually recommended us to use 16mm thick plate with 25mm bolt size where some time not economical and rejected by client
What should I do about this?
Thanks