Deansharafi
Electrical
- Dec 9, 2003
- 58
What is the remedy for a switchgear when its fault capacity is exceeded? Let's consider a case where generators are added to a busbar without considering the fault capacity of the board.
Is there anything that can be done to rectify the situation?
Thanks for your thoughts.
Is there anything that can be done to rectify the situation?
Thanks for your thoughts.