Serene111
Civil/Environmental
- Feb 20, 2020
- 19
Hello,
I am trying to model a runoff drain to a swale. The swale is inside the drainage area.
In the HydroCAD model, I have one subcatchment going to a reach(open channel), but the TC in the subcatchment area includes the swale that is going to be discharged to. I was wondering if I should divide the subcatchment area into two subcatchment areas, so the TC would end before entering the swale. Does it make any difference doing so? Please advice.
Best,
Serene
I am trying to model a runoff drain to a swale. The swale is inside the drainage area.
In the HydroCAD model, I have one subcatchment going to a reach(open channel), but the TC in the subcatchment area includes the swale that is going to be discharged to. I was wondering if I should divide the subcatchment area into two subcatchment areas, so the TC would end before entering the swale. Does it make any difference doing so? Please advice.
Best,
Serene