JBIM
Industrial
- Nov 22, 2006
- 89
Hi, I´m working whit NX4 and I would like to know if it´s possible for two person to work at the same time in the same project: I mean each in differents sub assembly but both saving work in the same hard drive.
I know that team center is probably the best way to do it but I would prefer a shiper way .
Thanks a lot
I know that team center is probably the best way to do it but I would prefer a shiper way .
Thanks a lot