maguirre
Industrial
- Jun 13, 2001
- 1
Does anybody have any idea about an easy way to measure the technical advance of the work, in a Detailed aeronautical Design? The released weight? but with the 100% of weigth released, still remains the assy and installation drawings, which doesn,t add weight.
Than you!!
Than you!!