- 5
I am looking into a temporary bypass of a cooling water system to facilitate repairs on the cooling units. The current design temperature on the cooling water system is much higher than actual operating conditions (installed circa 1970). We wanted to use Victaulic fittings for the temporary piping for ease of installation and to cut down on labor time, but in order to do so we would need to derate the temperature of the temporary piping slightly to meet manufacturers specs, we would still be well above maximum operating conditions from the temperature profile we received for operating conditions over the past 2 years. I cannot find any code issues with designing the temporary pipe at the lower temperature and inserting a spec break at the tie-in point and wanted to check with the experts to see if anyone knew of any issues/code violations in doing this. Any comments would be appreciated.