odin12
Mechanical
- Nov 10, 2003
- 1
According to ASCE 7-98 or 7-03, is there an allowable lateral design load reduction for temporary connections for a Eifs lightgage wall panel over a 24 hr period until permanent connection is complete?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.