Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Temporary Design Load During Construction

Status
Not open for further replies.

odin12

Mechanical
Nov 10, 2003
1
According to ASCE 7-98 or 7-03, is there an allowable lateral design load reduction for temporary connections for a Eifs lightgage wall panel over a 24 hr period until permanent connection is complete?
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor