Guys,
I am in the business of designing movable equipment similar to giant cranes. I am looking for a code that allows the temporary reduction of wind load design during transient conditions. For me, my transient condition is less than 5 minutes. Both before and after the transient I will extend outriggers and will be able to withstand at least 100km/h plus LRFD safety factor. But many times during the day I have the need to retract, move for 5 minutes or less to a new site, extend again.
Does anyone have any idea of a Canadian or US code that allows temporary reduction to say, 50% of wind load during those 5 minutes? I found a German DIN standard 1055-4 that allows 50% reduction for transient condition up to 3 days. But that's German.
Thanks!
I am in the business of designing movable equipment similar to giant cranes. I am looking for a code that allows the temporary reduction of wind load design during transient conditions. For me, my transient condition is less than 5 minutes. Both before and after the transient I will extend outriggers and will be able to withstand at least 100km/h plus LRFD safety factor. But many times during the day I have the need to retract, move for 5 minutes or less to a new site, extend again.
Does anyone have any idea of a Canadian or US code that allows temporary reduction to say, 50% of wind load during those 5 minutes? I found a German DIN standard 1055-4 that allows 50% reduction for transient condition up to 3 days. But that's German.
Thanks!