There is an existing steel pipe rack which there are 3 levels of vertical bracing.
The lower level of one direction vertical bracing in one span have to be removed temporarily for one week to allow a crane to enter to do a job there, is it safe to do so? No wind speed there and it is hard to re-evaluate the original calculation design.