neaveyoung
Structural
- Jul 21, 2008
- 23
We have one project which need excavation for padestrian underpass. The underpass is below the road level about 20 meter and the length of the underpass is about 15m. So i'm thinking to use sheet piles to drive in and then strut with king post. i'm estimated the driven will need about 40m from the existing road level so that after excavation max.20 meter it will still have about 20 meter penetrate inside the soil.(let said).
So im thinking sheet pile is suitable for this case? Appreciate your suggestion.