Hello everyone
As per our project specification:
"Davits shall be tested to a safe working load 25% greater than the weight to be lifted. The safe working load shall be stamped on the davit following the test."
The contractor claims that this clause is only applicable to the top davit that is used to lift and lower the pressure vessel internals
However, for man way davits, this clause is not applicable because it is used only to lift the cover flange.
What are your thoughts and what are the common practices?
As per our project specification:
"Davits shall be tested to a safe working load 25% greater than the weight to be lifted. The safe working load shall be stamped on the davit following the test."
The contractor claims that this clause is only applicable to the top davit that is used to lift and lower the pressure vessel internals
However, for man way davits, this clause is not applicable because it is used only to lift the cover flange.
What are your thoughts and what are the common practices?