Hello!
In my country, grout for pile is tested to ensure compliance with the following criteria:
1. 28 day Compressive Strength
2. Flow Cone Efflux Time > 15s
3. Free Expansion < 10% in total
4. Bleeding < 2% in first 3 hours; < 4% in total and 24 hour reaborption
I understood that the control on bleeding is important to avoid excessive upflow of water leading to void, and 28 days strength is important for loading transfer.
However, what are the purpose/intention for limiting the free expansion and flow cone efflux time of gorut?
Can anyone explain?
In my country, grout for pile is tested to ensure compliance with the following criteria:
1. 28 day Compressive Strength
2. Flow Cone Efflux Time > 15s
3. Free Expansion < 10% in total
4. Bleeding < 2% in first 3 hours; < 4% in total and 24 hour reaborption
I understood that the control on bleeding is important to avoid excessive upflow of water leading to void, and 28 days strength is important for loading transfer.
However, what are the purpose/intention for limiting the free expansion and flow cone efflux time of gorut?
Can anyone explain?