a project is calling for 30" ductile iron class 52 pipe with push joints to be installed under a roadway with both ends left open for pressure testing after the roadway is back filled. The drawings call for quick flanges (sometimes referred to as EZ flanges or break flanges) to be installed on the ends of the pipe along with steel blind flanges to enable the pressure testing of the piping.
My question is if this quick flange and blind flange combination is a proper method of capping the ends of the pipe? The test pressure of 200 psi would produce very large forces on the ends of pipe of around 135,000 lbf.