fabuara
Mechanical
- Apr 29, 2010
- 7
In the case of a discharge header of a system of pumps in parallel (a total of five centrifugal pumps in the present case), must the outlet piping to the process be positioned after the last pump or can it start immediately before the last pump? By adopting the last arrangement, would there be loss in the flow capacity, some turbulence, or even loss of energy or a possible unbalancing of one or more pumps?