We are currently replacing the chillers and controls in a three-pipe system - HW supply, CHW supply and common return. Has anyone seen a system like this before and can you give me a sequence of operation? I am trying to decide if we need another by-pass on the chill water side to allow the chillers to run to cool the loop once we switch from the hot water side.
/dbl