I think I see where this is going. Is this what you are describing?
[ol]
[li]You have an existing dual feed 11kV board with a bus coupler between the two half boards.[/li]
[li]Each half board is fed from its own 132/11kV transformer.[/li]
[li]Each existing transformer is large enough to carry the full load in the event of an outage on the other transformer.[/li]
[li]You propose to install a pair of new transformers to replace the existing transformers.[/li]
[li]Each new transformer will have 2x 30MVA 11kV secondaries.[/li]
[li]Each half board in the existing substation will be fed from one winding of the new transformers, giving redundancy.[/li]
[li]A new substation similar in configuration to the existing one will be constructed.[/li]
[li]The two half boards in the new substation will be fed from the remaining winding on each transformer.[/li]
[li]You are proposing this because you have inadequate space for a pair of new transformers to feed the new substation.[/li]
[/ol]
If any of the above is incorrect, please help us understand what you are proposing.
----------------------------------