To Piping Experts: I'm new to piping industry, and I would like to learn about Tie-ins between new and existing piping system. How would you suggest a method statement for Tie-ins, both cold and hot tapping starting from spools fabrication at work shop all the way to hydrostatic pressure test after erection?
Thanks guys.
Thanks guys.