Structural
- Nov 27, 2002
- 2
We did the structural design of the tilt up wall panels for 2 story office building here in Raleigh, NC and are now being asked to verify that it is OK to take the temporary braces down. We did not design any of the temporary bracing, nor did we design any of the lifting inserts or methods to place the panels. The panels are all now connected to the main steel structure. Are there any rules of thumb for how long the braces need to remain in place? Should we be advising on when to remove braces? ACI 551.1 states that the engineer designing the lifting inserts typically also designs the temporary panel bracing. There doesn't appear to have been an engineer who did this design, as we did not get a submittal.
Any insight into this is appreciated!
Thanks,
Mitch Fluhrer, PE
Fluhrer Reed, PA
Any insight into this is appreciated!
Thanks,
Mitch Fluhrer, PE
Fluhrer Reed, PA