WE have a project with very sensitive slab, which we can't have saw-cuts, etc. We are trying to eliminate any joints in the area. Without placing the slab after tilt-up erection has anyone else achieved construction of tilt-up without using the pour strip. Thanks in advance for any suggestions, or information.