Robertofg
Geotechnical
- Nov 4, 2005
- 5
I have a dock project that requires the use of 12" timber (greenheart) piles with relatively high (7 ton) uplift capacity. The subsurface conditions consist mainly of a thin layer of sand (5 feet or so) underlain by weak fragmented limestone. In order to attain the required uplift capacity we are considering preaugering a socket in the limestone, filling it with grout and subsequently inserting the pile (preforming the timber piles). Does anybody know how to estimate the slip resistance between the timber pile and the concrete socket.