wojton
Civil/Environmental
- Dec 12, 2007
- 2
I've got a 2,000,000 gal. double toroid water tower that needs to be painted.The exterior and interior coating systems have failed. My consultant is recommending to abrasive blast all of the surfaces and then apply a three layer Polyamide Epoxy systen on the interior and a three layer epoxy primer, followed by two coats of Epoxy Siloxane system on the exterior. No lead or site condition issues. My consultant is telling me that the construction period will be 180 days. Any comments on the time period?