Enrico Urru
Bioengineer
- Aug 13, 2023
- 15
Hi everyone,
I am trying to design a 2 pulley system with a timing belt. The small pulley will be driven by a Nema 17 stepper motor, 0.4 Nm, speed 1000 rpm.
The largest pulley will be attached to a lead screw for driving a load and rotate at a speed of 250 rpm.
- I determined the power of the motor: Torque * angular velocity / 7127 = 0.056 hp
- I determined a service factor of 1.4, which gave me a design power of 0.0784 hp
- From the belt selection chart I determined a belt type XL, pitch 5 mm.
- The velocity ratio is 4, so I can use a small pulley with 10 teeth and a large pulley with 40 teeth.
At this point, I do not know how to select the timing belt.
Does someone know how to proceed? Is there a table that matches 2 pulleys with a belt length?
I am trying to design a 2 pulley system with a timing belt. The small pulley will be driven by a Nema 17 stepper motor, 0.4 Nm, speed 1000 rpm.
The largest pulley will be attached to a lead screw for driving a load and rotate at a speed of 250 rpm.
- I determined the power of the motor: Torque * angular velocity / 7127 = 0.056 hp
- I determined a service factor of 1.4, which gave me a design power of 0.0784 hp
- From the belt selection chart I determined a belt type XL, pitch 5 mm.
- The velocity ratio is 4, so I can use a small pulley with 10 teeth and a large pulley with 40 teeth.
At this point, I do not know how to select the timing belt.
Does someone know how to proceed? Is there a table that matches 2 pulleys with a belt length?