Can anyone help me about a problem as following:
We are building up vessel OD 3800 and use material Q345B made by china.When we was welded for long seam,the cracks appeared vertical weld seam. We have been proceed test for tensile and yield strength and chemical composition on base metal but the results were accepted. The weld procedure specification (WPS) and consumable to be used correctly. We have also preheat before welding but after RT the cracks appeared for full weld. We are intending replace all new material but cost impact take many.
I hope everybody give me the best solution. Thanks so much
We are building up vessel OD 3800 and use material Q345B made by china.When we was welded for long seam,the cracks appeared vertical weld seam. We have been proceed test for tensile and yield strength and chemical composition on base metal but the results were accepted. The weld procedure specification (WPS) and consumable to be used correctly. We have also preheat before welding but after RT the cracks appeared for full weld. We are intending replace all new material but cost impact take many.
I hope everybody give me the best solution. Thanks so much